Asbestos Removal in Wayzata

Condo updates, older-house renovations and tear-downs for new builds in Wayzata all begin the same way with us, with samples sent to a lab. Positive materials are removed under containment, the state notice is filed, and you get the clearance and disposal records at the end.

A third of today’s Wayzata homes went up in the 2010s, yet nearly 4 in every 10 predate 1980.

Request a free quote
A 1960s kitchen floor of sheet vinyl lifted at one edge to show the gray felt backing

Asbestos removal services

Asbestos testing

Whether you are opening one wall or taking down a whole house, asbestos testing is the first booking to make.

Kitchen and bath floors

Gray felt or paper on the underside of an older kitchen or bath vinyl calls for a lab test before the remodel. If it is positive, our floor tile and sheet vinyl removal crew takes it up wet.

Siding and roofing

Planning to re-side or reroof an older house? Read asbestos siding removal first, since cement shingles and old roofing layers need a sample before work starts.

Ceilings

Recessed lights in a condo or a fresh skim coat in an older house both mean disturbing the ceiling. If its texture tests positive, popcorn ceiling removal describes how we bring it down.

Renovations and tear-downs

Clearing a lot for a new house, or gutting an older one? See remodel and demolition abatement for what has to come out before the builder starts.

Old and new in Wayzata

Wayzata mixes very old and very new. Homes from 1939 or earlier make up about 1 in 20, those from before 1950 close to 1 in 10, and the median home dates from 1988.

Buildings of five or more units hold just over half of Wayzata’s homes, and renters live in about 4 in every 10.

Older houses

In a house built before 1980, sampling shows which of the MDH-listed materials it contains, if any, before your contractor opens a wall.

Condos and apartments

Larger condo and apartment buildings, five units and up, need MPCA notified ten working days in advance when regulated asbestos will be disturbed. We work out building access with the owner or association.

Permits in Wayzata

Wayzata’s demolition checklist covers utility disconnects, erosion control, tree protection and a land survey, with no asbestos item on it. The city’s permits page adds that demolition can’t start until the utility disconnects are verified.

The asbestos side follows state rules, and removal must be finished at least two days before the demolition date.

A 1950s bathroom opened for a remodel, with the tub surround wall cut out, floor tile lifted and plastic up

Frequently asked questions

Can a Wayzata homeowner remove asbestos?

Only in a single-family house you live in, and even there MDH strongly recommends a licensed contractor. For a regulated amount, condo and apartment owners and anyone renting out a home need a licensed crew.

Does a house tear-down need an MPCA notice?

Not for a house of four or fewer units, since MPCA leaves those out. Three cases are the exception: a house converted from another use, a single owner taking down several houses, and demolition tied to urban renewal, highway or commercial development.

What if asbestos turns up mid-remodel?

Tape off the spot, keep the crew away from it and call us for a sample. A surprise find still waits the five-day notice, since MDH won’t call it an emergency.

What paperwork should I keep?

Keep three things with your house records: the MDH permit, each waste manifest and the lab’s air-sampling report.

New Hope project? Read asbestos removal in New Hope or our home page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (763) 292-3492

Call (763) 292-3492